Skip to content

FAQ

We've answered the most common questions about roofing, standing seam, tile, insulation, and façade work.

On this page we've grouped the 55 questions most often asked when getting a roof built into 7 topics: standing seam or tile, whether insulation is necessary, where a roof window (skylight) is installed, and how to get a quote. Because exact timelines, prices, and product choices depend on the structure, answers on these topics honestly state that they "become clear after the site survey."

Standing Seam Roof

What is a standing seam roof?

A standing seam roof is a roof system formed by shaping metal sheets such as aluminum or galvanized steel into pans and seaming their edges together. The pans are fixed to the substructure with concealed clips, so no screw holes are made in the covering surface. Thermal insulation and waterproofing layers lie beneath it; the layer order and pitch are determined for the building at the site survey.

Which types of buildings is a standing seam roof applied to?

A standing seam roof can be used on villas, apartment buildings and residential complexes, workplaces, sports halls and places of worship. The suitability of the application for the building is determined by evaluating the roof's pitch and supporting structure at the site survey.

What is the difference between a standing seam roof and a tile roof?

A standing seam roof is a roof covering of metal pans with a clean-lined, modern appearance. A tile roof, on the other hand, consists of individually laid clay or colored tiles and is a heavy covering; therefore the supporting structure must be suitable for the load. Both coverings have a minimum pitch limit that varies by manufacturer. The choice is made according to the building's architecture, roof pitch, the desired appearance and the budget.

Can rain and hail be heard on a standing seam roof?

This question is common because a metal surface can transmit the sound of rain and hail. The sound level depends not only on the metal itself but also on the layer build-up beneath it; layers such as thermal insulation and decking matter in this respect. Since measured decibel values vary by product and system, the manufacturer's test documents should be requested.

Does thermal expansion cause problems on a standing seam roof?

Metal expands when hot and contracts when cold; if this movement is not accounted for, stress can build up at the seams and connections. For this reason pans are held with concealed clips, and sliding clips allow lengthwise movement. For titanium-zinc, one manufacturer (RHEINZINK) calculates an expansion of about 2.2 mm per meter for a temperature difference of 100 degrees. Panel length limits vary by product; the manufacturer's current installation guide should be consulted.

What is the minimum pitch for a standing seam roof?

The minimum pitch varies by metal, seam type and manufacturer. For example, RHEINZINK gives 3 degrees (about 5.2%) as the lower limit for a double standing seam and requires a seam sealing tape between 3 and 7 degrees. A standing seam can be applied at lower pitches than tile; even so, the exact value should be taken from the current installation guide of the selected product.

Does condensation occur on a standing seam roof, and is ventilation needed?

If the cold inner face of the metal meets warm, humid air from inside, condensation can form; this can lead to corrosion, timber rot and mold. Manufacturer guides mention two measures: installing a vapor control layer on the inner side of the insulation, or leaving a cavity on the outer side of the insulation that is ventilated with outside air. For zinc, avoiding direct contact with timber decking is also recommended.

Tile Roof

How long does a tile roof last?

A properly selected tile and a correctly installed roof system can serve for many years. Service life depends on the quality of the tile, the substructure, roof-space ventilation, installation workmanship and the maintenance routine. The exact period and warranty terms are stated in the documents of the company that manufactures the product.

What is the difference between clay tile and concrete tile?

According to the Vocational Qualifications Authority (MYK) occupational standard for tile roof installers, clay tile is produced by shaping clay, drying it and then firing it; concrete tile is produced from natural sand, cement, additives and color pigment. On clay tiles the surface may be natural fired, engobe or glazed; on concrete tiles the color comes from pigment. Since weight and strength values vary by product, the product data sheet should be consulted.

What is the minimum pitch for a tile roof?

Each tile type and manufacturer has its own minimum pitch limit; the lengthwise overlap distance of the tiles is also selected from the product table according to the pitch. When the pitch falls below the limit, a waterproofed sub-roof and manufacturer approval are generally required; increasing the overlap does not always permit going below the limit. The current value should be taken from the installation guide of the selected tile.

Can a tile roof withstand Konya's winters?

According to observations for 1975–2006, the temperature drops to 0 °C on about 103 days a year in Konya, and the lowest temperature in measurements by the Turkish State Meteorological Service (MGM) is -28.2 °C. Under these conditions the frost resistance of the tile is decisive. The frost resistance of clay tiles is tested by the TS EN 539-2 method and the products fall under TS EN 1304; when choosing, the manufacturer's frost resistance declaration and the relevant documents should be requested.

Does a membrane need to be laid under the tiles?

Tile underlay is a second waterproofing layer that carries away water that may reach beneath the tiles; breathable types also let vapor pass out. When the pitch is low, this layer is more important: under the rules of some countries, an additional sub-roof is required when the pitch falls below the tile's minimum pitch limit. Whether it is necessary is determined by the roof pitch, tile type and the manufacturer's guide.

What is re-roofing (tile re-laying)?

Re-roofing (tile re-laying) is removing the existing tiles, inspecting the structure beneath them and, after the necessary repairs, laying the tiles again. It is considered in cases such as leaks, slipped or broken tiles and deterioration of the underlay; at this stage the waterproofing and thermal insulation layers can also be renewed. Work that touches the supporting structure is evaluated separately; the relevant municipality should be consulted regarding permits.

Can wind blow tiles off?

On a roof, wind creates not only pressure but also suction (uplift) loads; standards divide the roof surface into zones and consider suction separately for local elements such as tiles. Manufacturers require tiles above a certain pitch to be additionally fixed with screws or wind clips; the number and spacing are taken from the installation guide. In records of the Turkish State Meteorological Service (MGM), the fastest daily wind in Konya is 32.4 m/s.

Insulation

Is roof insulation necessary?

Yes. Waterproofing helps protect the structure from rain and snow water, while thermal insulation and the vapor barrier help protect against heat loss and moisture buildup beneath the roof. No matter how high the quality of the roof covering, leaks and moisture problems can arise if the layers beneath it are not done correctly.

Are waterproofing and thermal insulation the same thing?

No, their functions are different. Waterproofing prevents rain and snow water from entering the structure; thermal insulation reduces heat flow. The vapor barrier keeps indoor moisture away from the insulation layer; a breathable waterproofing membrane does not let water through but releases vapor outward. According to a Turkish academic study, these layers cannot be used in place of one another.

What is a vapor barrier and where is it placed on a roof?

A vapor barrier is the layer that limits the passage of humid indoor air into the insulation layer and the roof cross-section. It is placed innermost in the cross-section, that is, on the warm side; the vapor resistance of the layers should decrease from inside to outside. A barrier placed on the outside can trap moisture inside and cause condensation. A breathable membrane does not take over the job of a vapor barrier.

In what order do the layers go in roof insulation?

On a pitched roof, the logic from inside to outside is as follows: supporting structure, vapor barrier, thermal insulation, ventilation gap or breathable membrane, then the covering. The cross-section varies according to whether the roof is a cold or warm roof, the type of covering and the use of the space beneath. The choice of materials and thicknesses is determined by the project and the site survey.

Why do condensation and mold form on a roof?

Warm, humid indoor air condenses when it meets a cold surface in the roof cross-section; the cold underside of a metal covering or an uninsulated cold roof space are such surfaces. Accumulated water can lead to mold, timber rot and corrosion. The solution is to consider together vapor control on the inner side, ventilation on the outer side and insulation details that reduce thermal bridges.

Why do ice dams and icicles form on a roof?

According to U.S. Department of Energy sources, when there is snow on the roof, heat escaping from the heated space warms the underside of the covering; the snow melts from below, and the water refreezes at the cold eaves, forming ice dams and icicles. Accumulated water can seep beneath the covering, and falling ice can cause damage. Recommended measures are sealing air leaks, strengthening ceiling insulation and providing roof ventilation.

Which standard applies to roof thermal insulation?

Thermal insulation rules for buildings are regulated in the TS 825 standard; the 2024 edition of the standard became mandatory in 2025 by a communiqué of the Ministry of Environment, Urbanization and Climate Change. The standard defines limit values by climate zone; the current value valid for Konya should be checked at the project stage against the standard and the Regulation on Energy Performance of Buildings.

Façade Cladding

Why is façade cladding preferred?

Façade cladding protects the exterior surface of the building against external factors such as rain, wind and sun, and gives the building a tidy, renewed appearance. When an insulation layer is applied beneath it, it can also contribute to heat and moisture management.

How does ventilated façade cladding work?

In a ventilated façade, from outside to inside there are the cladding, the ventilation gap, thermal insulation and the supporting substructure. The natural air movement in the gap (stack effect) carries moisture out and contributes to the thermal balance; in open-joint systems, rain entering through the joints also drains down through the gap. Since the same gap can work like a chimney in a fire, the insulation and cladding class are selected according to regulations and the project.

Which materials are used for façade cladding?

Commonly mentioned groups are composite aluminum panel, fiber cement board, compact laminate (HPL), cladding systems such as ceramic and granite, heat-treated timber, and external insulation (ETICS) systems finished with render. In selection, climate and frost effect, maintenance, fire class, weight and substructure, appearance and compatibility with thermal insulation are evaluated together; the technical data sheet and test certificate of each product should be requested.

What should be considered for fire safety in façade cladding?

The Regulation on Fire Protection of Buildings requires flammability classes for façade materials depending on building height; if an insulation system is applied, it must be certified together with the system components. In ventilated systems, because the gap causes a chimney effect, it is important to choose a non-combustible class such as stone wool for the insulation. In composite panels, the core type is also decisive. For current requirements, the project's designer of record should be consulted.

Is external insulation the same as façade cladding?

No. External insulation (ETICS) is a system formed by bonding a thermal insulation board to the façade, fixing it with anchors if needed, and applying a reinforced base render and a finishing coat. Façade cladding, on the other hand, is generally an outer shell made of panels or sheets attached to a substructure, and it can be installed ventilated. Which one is suitable is determined by the condition of the building, its height, appearance expectations and fire requirements.

Is a permit required for façade cladding and façade insulation?

The Regulation on Zoning for Planned Areas does not require a building permit for thermal insulation works that do not affect the structural system and meet certain conditions; the conditions include obtaining consent, the energy performance certificate class being at least C, and having a certified applicator. Works that change the appearance, material or color of the façade are evaluated separately in terms of the building management plan and municipal rules. Administrative practice may differ; the relevant municipality should be consulted.

Roof Windows and Solar

Which roofs can a roof window be installed on?

Roof windows are used on pitched roofs to bring daylight and ventilation into spaces such as attics and mansards. The type and pitch of the roof covering are taken into account when choosing the suitable window model and installation detail. In the VELUX Türkiye catalog, the pitch range is 15 to 90 degrees for most models and 15 to 55 degrees for some series. The waterproofing around the window must be done correctly.

At what height and where should a roof window be placed?

The VELUX Türkiye catalog recommends that the lower edge of the window be 90–120 cm from the floor and the upper edge 185–220 cm high; as the roof pitch decreases, a longer window needs to be chosen. For daylight comfort, a glazed area of at least 16% of the room's floor area is also a manufacturer recommendation, not a regulatory provision. The use of the room and the furniture layout also affect placement.

Does a roof window leak?

The leak risk arises less from the window itself than from the installation detail around it. Manufacturer systems consist of an apron flashing, an underlay membrane and a drainage channel; sealing with silicone alone does not replace this system. Incorrect installation of window flashings and of valleys and chimney bases is among the main causes cited for roof leaks; these points should be checked regularly.

Does a roof window heat up in summer and lose heat in winter?

Glass surfaces let solar radiation in; therefore external accessories such as exterior shutters or awnings are useful for reducing summer heating. The area around the window matters for heat loss: manufacturers' flashing sets with an insulating frame aim to reduce heat loss and thermal bridging. Actual behavior varies with window type, glazing and installation; the manufacturer's technical data should be consulted.

Why does fogging occur on a roof window?

The main cause of fogging is moisture in the indoor space; humid indoor air condenses when it meets a cold surface. The solution is to reduce moisture sources and ventilate the room regularly; even opening the window briefly is effective. Manufacturers aim to reduce the risk of condensation in the roof with flashing sets that include a vapor barrier.

Is a permit required to install a roof window?

The Regulation on Zoning for Planned Areas allows roof windows to project above the roof covering to a size and form the administration finds appropriate. If the window requires intervention in rafters or supporting elements, the work may affect the structural system; under the regulation, works affecting the structure count as substantial alteration and require a permit. In an apartment building the roof is a common area. Practice may vary by administration; the municipality should be consulted.

What is a solar panel-integrated tile?

A solar panel-integrated tile is a building element in which solar cells are placed inside the covering product; while a conventional panel is added on top of the roof covering, this product replaces the covering. Since efficiency and service life vary by manufacturer, a technical data sheet should be requested and pitch, orientation, shading and ventilation conditions evaluated. The Regulation on Zoning for Planned Areas provides for photovoltaic panels to be used as roof covering provided they stay within the roof pitch and do not affect its silhouette.

Does installing solar panels on a roof require a permit?

Under the Regulation on Zoning for Planned Areas, solar-based renewable energy systems installed for the building's own needs do not require a building permit; however, a project or undertaking must be submitted to the administration, the architectural appearance must be adhered to, and permission must be obtained from the administration. In apartment buildings, the roof being a common area may additionally bring the unit owners' general assembly decision onto the agenda. For details, the relevant municipality should be consulted.

Quote and Process

What should I do to get a quote?

You can fill out the Get a Quote form on the site, or reach Rızaoğlu Çatı by phone or WhatsApp using the contact details on the page. Sharing the type of work you want, the approximate condition of your roof and its location makes the evaluation easier; you are then contacted and a site survey is scheduled.

What is checked during a roof site survey?

At the site survey, the condition of the covering, thermal insulation and waterproofing, chimney and wall bases, eaves details, and gutters and downpipes are evaluated together. The straightness of the supporting elements, ventilation, the surroundings of valleys and roof windows, and roof access and safety conditions are also among the points examined. Problems are diagnosed and reported; whether a partial repair or a complete renovation is needed is determined at this stage.

Which items should a roof quote include?

There is no universally accepted norm on this; the general good practice is for the scope to be written and itemized: removal and waste disposal, if necessary repair of the substrate beneath the covering and of the supporting structure, layers (vapor barrier, thermal insulation, ventilation, waterproofing), covering and accessories, gutters and downpipes, chimney, valley and window surround details, scaffolding and fall prevention, the quantity takeoff method, and brand, model and thicknesses. It is also important that payment and delivery terms are in writing.

What does the cost of a roof depend on?

Cost varies according to the roof's area and geometry, the selected covering and layer system, whether removal is needed, the need for repairs to the supporting structure, scaffolding and access conditions, and the scope of the work. For this reason, a sound figure cannot be given without a site survey. When comparing quotes, one should look not only at the total amount but also at the item scope.

How long does a roofing job take?

Duration depends on the roof's area, whether removal is needed, repair of the supporting structure, the selected covering system, the amount of detail work and weather conditions. For this reason a fixed duration cannot be given without a site survey; the schedule is planned together once the scope is clear, also taking the weather into account.

What steps does the roof renovation process involve?

The process generally starts with a site survey and measurement; then the scope is determined, a written quote is prepared and, if required, permits and the unit owners' decision are completed. In execution, removal and a check of the supporting structure come first, then the layers and covering are applied; details such as gutters, chimney and window surrounds are finished. The job is completed with roof cleaning and, if requested, a water test.

Is a permit required for roof repair or renovation?

The Regulation on Zoning for Planned Areas counts roof repair and tile re-laying as simple repair, and does not require a building permit for simple repairs and alterations. Works that affect the structural system or change the area or use of the attic are considered substantial alteration and require a permit. This assessment is an inference from the regulation's definitions; a separate regulation applies in unplanned areas, administrative practice may differ, and the relevant municipality should be consulted.

Is a unit owners' decision required to renovate the roof of an apartment building?

Under the Condominium Ownership Law, roofs, chimneys and rain gutters are common areas. For repair and construction works in common areas, the decision of the unit owners' general assembly and the management plan are generally decisive; expenses are shared in proportion to land shares. Which majority is required between mandatory maintenance and improvement depends on the nature of the work, so the management plan should be consulted and, if necessary, legal advice obtained.

What is the best season for roof construction?

Roof work proceeds more easily in periods without rain and with little wind. According to data from the Turkish State Meteorological Service (MGM), precipitation in Konya is lowest in July and August; frost events are concentrated mainly in winter. The suitable schedule is planned together according to the scope of the work and weather conditions.

General

When is a roof renovation needed?

Signs such as stains and damp marks on the ceiling, dripping in the rain, broken or slipped tiles, cracks and rust in the covering, and gutters that constantly overflow indicate that the roof should be inspected. A small repair may be enough, but if the damage is widespread or the roof is nearing the end of its life, renovation may be needed; which one is required is determined by a site survey.

Why is roof pitch important?

Pitch ensures that rain and snow water leaves the roof quickly and in a controlled way. Each type of covering has a pitch range in which it can be used safely; if the pitch is insufficient, water can back up beneath the covering. Pitch also affects snow load: according to TS EN 1991-1-3, the roof shape coefficient is 0.8 up to 30 degrees, decreases beyond that pitch, and is taken as zero at 60 degrees. The valid range for a covering is stated in the product's technical information.

Does the regulation set a limit for roof pitch?

The roofs article of the Regulation on Zoning for Planned Areas does not give a fixed percentage; pitch is determined with the approval of the relevant administration, taking into account the roof material, the architectural character of the area and climate conditions. The same article also includes a provision that the ridge height must not exceed 5.00 m. The Regulation on Zoning for Unplanned Areas mentions a 33% pitch for tile-covered roofs. For practice in Konya, the municipal zoning department should be asked.

Why are gutters important on a roof?

Gutters and downpipes collect water coming from the roof and carry it away from the building. When this system does not work properly, water can damage façades and the foundation. Cleaning gutters of leaves and dust reduces the risk of clogging; the diameter and number of downpipes should also be planned according to roof area and rainfall.

What material should a gutter be made of?

The gutter material should be chosen to be compatible with the roof covering, because contact between different metals and the direction of runoff can cause corrosion. According to manufacturer guides, runoff of copper onto zinc quickly degrades the zinc; galvanized steel, anodized aluminum and stainless steel are suitable in direct contact with zinc. The general principle is that water should not run from a higher-potential metal onto a lower-potential one.

How many downpipes are needed?

The number and diameter of downpipes are calculated according to roof area, gutter length and rainfall intensity. A manufacturer guide based on Dutch practice (NedZink) specifies at least one downpipe for a roof smaller than 100 m² and at least two for a larger roof. This is a manufacturer example; for Türkiye the rainfall intensity is determined separately, and the relevant standard and the project should be consulted for the calculation.

How often should a roof be maintained?

For inspection, the periods before rain and before winter stand out; the covering, apron flashings and gutters should be examined at least a few times a year. The points to check are the covering, the chimney surroundings, joints, gutters and downpipes, and waterproofing. As general good practice, inspecting in spring and autumn, plus an extra look after severe weather events, is helpful.

Can I climb onto the roof and inspect it myself?

A roof is a hazardous work area. According to the Ministry of Labor and Social Security (ÇSGB) occupational health and safety information card, fall protection should be planned even for simple maintenance work, it should be checked that the roof has no fragile areas and can bear the load and that there is no wind or icy surface, and a fixed ladder or at least a tower scaffold should be used for access; rain gutters are not suitable as anchor points. Seeking professional support for roof work is recommended.

How much is the snow load on roofs in Konya?

According to the National Annex of TS EN 1991-1-3 (2007), Konya is in Snow Zone II; in this zone the table value of ground snow load for an altitude of about 1000 m is 1.05 kN/m² (on the order of 105 kg/m²). This is a design value; the load on the roof varies with pitch, wind exposure and projections, and the calculation is made by an engineer. The zone and altitude for the districts should be checked separately.

Is a snow guard necessary?

A snow guard reduces uncontrolled sliding of snow off the roof in large pieces. It is recommended in regions with heavy snow, above entrances, walkways and parking areas, and on slippery coverings such as metal; the number and placement are determined from the manufacturer's guide according to roof pitch and ground snow load. A snow guard is not fall protection. On a roof with snow guards, the assumption that load decreases as pitch increases does not hold; the roof shape coefficient is taken as at least 0.8.

How does Konya's climate affect roof selection?

According to data from the Turkish State Meteorological Service (MGM), the lowest temperature measured in Konya is -28.2 °C and the highest is 40.9 °C; annual precipitation is about 320–330 mm, and according to 1975–2006 observations the temperature drops to 0 °C on about 103 days a year. This picture brings frost resistance, snow load, thermal movement in metal, insulation and ice formation to the fore; the choice of covering should be evaluated together with these factors.

Didn't Find the Answer?

Send us your question or give us a call, and we'll point you in the right direction for your roofing and façade project.