SİM Proof Membrane
SİM Proof Membrane: a mineral-surfaced bituminous waterproofing membrane applied before concrete is poured.
According to the manufacturer, SİM Proof Membrane is a bituminous waterproofing membrane with a mineral-surfaced finish, applied before the concrete is poured. It is stated to be designed to bond with the concrete poured over it and become one with it. The manufacturer defines separate types for horizontal and vertical surfaces. Pre-concrete application brings this membrane into consideration in projects where it is difficult to reach the outer face of the structure afterwards.
Membranes of this type are generally considered for structural elements in contact with soil, such as foundations and basements. To determine the type that suits your project, you can request a site survey and quote from Rızaoğlu Çatı in Konya.
SİM Proof Membrane Products
What does a membrane applied before concrete mean?
In the traditional method, waterproofing is applied to the surface after the concrete has been poured and hardened. With membranes laid before the concrete, such as SİM Proof, the order is reversed: the membrane is placed first, and the concrete is then poured over it. This approach comes to mind for wall and foundation details where it is difficult to reach the outer face of the structure afterward.
How are the horizontal and vertical application types distinguished?
The manufacturer defines two types: SİM Proof H is for horizontal and SİM Proof V for vertical application. Horizontal application generally concerns the base of the structure, and vertical application the wall surfaces. Which type will be used is determined by the cross-section of the project; for this decision, the structural and architectural project and the manufacturer's technical data sheet must be evaluated together.
What should you pay attention to during application?
- The substrate must be level and clean, and the membrane must be placed without being stretched.
- Joints and corner turns must be sealed completely according to the manufacturer's instructions.
- The membrane must not be damaged during concrete pouring and rebar placement.
- How to prepare the face that will be in contact with the concrete is detailed in the manufacturer's technical data sheet; it should be read before application.
Which products are considered together?
For surfaces whose top will remain exposed, you can look at bituminous waterproofing membranes, and for detail and joint points at liquid products. For the layer plan across the whole building, our roof insulation and waterproofing service page is helpful.
Other Product Groups
Bituminous Waterproofing Membranes
SİM Quickshingle
SİM Shingle
SİM Self Membrane
SİM Self Tapes
SİM Plan PVC Waterproofing Membranes
Liquid Products
Drainage Sheet
Site Survey and Quote for SİM Proof Membrane
Tell us which product and quantity you need, and our team will contact you to plan the quote process together.
- 1 Send Your Request
- 2 We'll Call You
- 3 Site Survey and Quote