- Author: Rızaoğlu Çatı Editorial Team
- Published:
- Updated:
- 6 min read
Table of Contents
Short answer: The main mistakes to avoid are: a pitch that does not suit the covering, neglecting the vapor barrier and ventilation, letting different metals touch, skipping snow and ice measures, disregarding chimney, valley, and eaves details, choosing a quote without comparing scope, a quote without a site survey, lack of maintenance, an inadequate gutter and downpipe system, and skipping the permit check.
The ten items below are based not on a statistic but on technical facts compiled from manufacturer guides, the national occupational standard, official institution publications, and legislation. The order is not a ranking of importance. At the end of each item there is a question that can be asked at the quote or site survey stage to avoid that mistake.
Pitch and layer mistakes
1. Not matching the pitch to the covering
Every covering and product has a minimum pitch at which it works safely. For tile, this limit varies by product and manufacturer; below the limit, a sub-roof with additional waterproofing and manufacturer approval are required. For metal too, the value is not fixed: a titanium-zinc standing seam manufacturer gives a minimum pitch of 3° and requires a standing seam sealing tape between 3° and 7°. Increasing the overlap does not always allow going below the tile's minimum pitch; a tile manufacturer states this explicitly. The Regulation on Zoning for Planned Areas, on the other hand, does not give a fixed percentage; the authority determines the pitch according to the material, locality, and climate. For details, see the article how to choose roof pitch.
2. Neglecting the vapor barrier and ventilation
When warm, humid air from inside meets a cold surface in the roof cross-section, it condenses. In metal roofs, this can lead to corrosion, and in wood to rot and mold. The vapor barrier goes on the warm side of the insulation; the breathable membrane is placed near the outside, and the two cannot be used in place of one another. The article roof insulation layers and vapor barrier explains the layer logic.
Metal, snow, and detail mistakes
3. Letting different metals touch, forgetting expansion
Titanium-zinc manufacturers state that copper cannot be used above zinc and that water running from copper onto zinc quickly degrades the zinc; another manufacturer also says water should not flow from a high-potential metal to a low-potential one. Galvanized steel, anodized aluminum, and stainless steel are suitable for direct contact with zinc. Thermal movement is a separate matter: titanium-zinc expands about 2.2 mm per meter at a temperature difference of 100 K; for this reason, a fixed and sliding clip arrangement is used in metal roofs.
4. Skipping snow and ice measures
According to the National Annex of TS EN 1991-1-3, Konya is in Snow Zone II, and the ground snow load table value for an altitude of 1000 m is 1.05 kN/m²; this is a limit value, and the actual design load is determined by the project engineer. The snow load on the roof decreases with pitch, but this reduction is not counted if there is a snow guard. The Turkish State Meteorological Service (MGM) records that the greatest snow depth measured in Konya was 66 cm (February 22, 1945). If, while there is snow, heat escaping from the heated space warms the underside of the covering, the snow melts from below, refreezes at the eaves, and an ice dam forms; the US Department of Energy guide lists sealing air leaks first, followed by ceiling insulation and ventilation. Ice and snow breaking off the roof can harm people beneath the eaves. In the sources, a snow guard appears as a recommended measure in regions with heavy snowfall, above entrances and pedestrian paths, and on slippery coverings such as metal. For definitions, see the terms snow load and ice dam.
5. Disregarding chimney, valley, and eaves details
A roofing systems manufacturer's guide lists the sources of sealing failure as faulty installation at valleys, chimney and wall bases, and roof window aprons, gutter blockage, and material aging. Water finds its way at these junction points more than on flat surfaces. For this reason, chimney flashings, valley profiles, and tapes should be written in the quote as separate items.
Quote and site survey mistakes
6. Not comparing item scope
The difference between two quotes is often not in the total figure but in the scope of items. One may include demolition, scaffolding, underlay, vapor barrier, and gutters and downpipes, while the other may include only the covering. There is no single-source item list for a roof quote; the general good-practice list derived from the work sequence in the national occupational standard covers the following:
- Demolition and transport, the surface beneath the covering, and, if needed, repair of the supporting structure.
- Vapor barrier, thermal insulation, ventilation, and waterproofing layers.
- Battens, covering, and accessory pieces.
- Gutters, downpipes, and detail pieces such as chimney, valley, and window.
- Scaffolding and fall prevention.
For details, see the article how to read a quote.
7. Getting a quote without a site survey and measurements
The national occupational standard lists, before starting work, comparing project dimensions with the work area, checking whether works such as chimneys are at the project elevation, and examining the evenness of the existing supporting structure. A quote given without on-site measurement and inspection skips these checks; an error in measurement and quantity takeoff leads to missing material or additional work. The roof calculator gives a preliminary idea of the area but does not replace a site survey.
Mistakes after the roof is built
8. Not having a maintenance plan
A manufacturer guide recommends that the covering, flashings, and gutter be inspected at least a few times a year and that aging parts be renewed. The ventilation band at the ridge, the chimney and window flashings, and snow accumulation at the eaves are these inspection points. Going on the roof is also a fall risk: the Ministry of Labor and Social Security information card requires suitable access and a check for fragile areas even for simple work; a rain gutter is not a suitable anchor point for safety. Washing the roof with pressurized water when seeing moss is also a mistake: some manufacturer guides do not recommend high-pressure washing. For an inspection calendar, the seasonal roof maintenance checklist can be used.
9. Not sizing the gutter and downpipes to the roof
Gutters and downpipes must be able to carry the water the roof collects. A Dutch titanium-zinc manufacturer requires at least one downpipe for roofs smaller than 100 m² and at least two for larger ones; this is one manufacturer's example, and rainfall intensity is determined separately for Türkiye. A gutter with no slope or a reverse slope holds water, leaves cause blockage, and in long zinc gutters an expansion element is needed when the total thermal movement exceeds 20 mm. For selection, see the article rain gutters and downpipe system.
Legislation and common areas
10. Skipping the permit and approval check
The Regulation on Zoning for Planned Areas counts roof repair and tile re-laying as minor repair and does not make it subject to a building permit; work that affects the supporting structure or changes the use is major renovation and requires a permit. This is an inference; practice may vary by authority, and the relevant municipality should be consulted. In apartment buildings, the roof is a common area under Condominium Law No. 634; the decision depends on the management plan and the provisions of the law, and legal advice should be sought if necessary. For details, see the article when re-roofing is needed.
In summary: questions that prevent mistakes
| Mistake | Preventive question |
|---|---|
| Pitch | Is the manufacturer's minimum pitch achieved on my roof? |
| Vapor and ventilation | On which surface does the vapor barrier go, and where is the air path? |
| Metal contact | Which metals will touch, and in which direction will water flow? |
| Snow and ice | Are a snow guard and an eaves measure needed? |
| Details | Are the chimney, valley, and eaves items written separately? |
| Scope | Is the item scope of the quotes equal? |
| Site survey and measurements | Were on-site measurements and inspection done? |
| Maintenance | Is there an inspection calendar? |
| Gutter and downpipe | Are the number of pipes and the gutter cross-section suited to the roof? |
| Permit | Have the authority and the management plan been checked? |
For a site survey and quote, you can reach us through the quote page.
FAQ
What should be checked first when having a roof built?
First the compatibility of the cladding with the pitch should be checked, then the layer arrangement, detail points and the item scope of the quote. Whether a survey and measurements have been carried out, and whether permit and common-area rules have been checked, are also at the top of the list.
What should be considered when comparing roof quotes?
Before the total figure, look at the item scope: are demolition, scaffolding, substrate, vapor barrier, insulation, gutter and downpipes and detail parts all written down, and are material brands and thicknesses stated? There is no item list compiled in a single source; this is general good practice.
Can a copper gutter be used on a zinc roof?
Titanium zinc manufacturers state that copper cannot be used above zinc, because water running from copper onto zinc quickly deteriorates the zinc. Metal pairings and the direction of water flow should be checked at the project stage against the manufacturer's current guide.
Are snow guards mandatory on a roof?
A provision claimed to make snow guards mandatory at a given pitch is not used as a basis in this article. In the sources, the snow guard appears as a recommended measure in areas with heavy snowfall, above entrances and walkways, and on slippery claddings such as metal; the number is determined by pitch and snow load.
Is a permit required to renew a roof?
The Regulation on Zoning for Planned Areas generally treats roof repair and tile re-laying as simple repairs; work that changes the load-bearing structure or the use requires a permit. Because practice may vary by authority, the relevant municipality should be consulted.